Home > Products > Other Plastic Track Series > Colourful Synthetic Silicon PU Water-based Courts Sports Surface Flooring Athletic Running Track

Colourful Synthetic Silicon PU Water-based Courts Sports Surface Flooring Athletic Running Track

Min. Order:
1
Share:
  • Product Description
Overview
1, polished. Polish the concrete cement foundation to smooth it.
2. Pickle the ground. Clean the concrete floor - clean the water and soak the ground - clean with 8% dilute hydrochloric acid - rinse with clean water (restore the original color of the cement floor) - dry, no white powder and floating material on the surface, and circle the product The water is marked.
2. Handle the shrink seam. Clean all the dust and other impurities in the shrinkage joint of the concrete floor and repair them one by one with QT material.
3. Primer (0.2 kg/m2) for roller coating. In the case of drying the cement floor, the primer is evenly coated or sprayed evenly on the ground to achieve a film-free state on the ground.
4, leveling and repairing. In the water accumulated in the pickling process, fill the material with QT, fill in the depression in the field, and reduce the water accumulation.
5. Construction of elastic layer (dosage 1.2kg/m2/mm). When the primer is basically cured (can be applied to the person), the elastic layer (1-2mm) is scraped with a tooth scraper. When the previous layer is not sticky, it can be polished and applied. Layer (to make the adhesion between each channel stronger), if the coating film is thin (less than 1mm), the tooth scraper is difficult to level, can be scraped with a squeegee, should avoid in the morning and the hot sun Construction (the actual site uses more gums, two thicker at a time).
First construction
After the first polish
Second construction
6. Construction of the surface layer paint (0.2 kg/m2). The elastic layer is not sticky (can be applied to the person). After the elastic layer is polished, it is necessary to ensure no water immersion within 24 hours after the construction.
7, scribing.
Precautions:
1. Minimize the construction time between each floor, depending on the construction weather and construction conditions on site. If the interval process needs to be increased in cleaning and grinding, the adhesion of the material can be ensured.
2. The surface must be cleaned before each process in the construction process.

3. After the construction of the site is completed, it must be maintained for 5 days before being put into use.

Silicon PU course construction technology

Product Categories : Other Plastic Track Series

Home > Products > Other Plastic Track Series > Colourful Synthetic Silicon PU Water-based Courts Sports Surface Flooring Athletic Running Track
Email to this supplier
  • *Subject:
  • *To:
    Mr. Jiguang Chen
  • *Email:
  • *Message:
    Your message must be between 20-8000 characters
Send Inquiry
*
*

Related Products List

Home

Product

Whatsapp

About Us

Inquiry

We will contact you immediately

Fill in more information so that we can get in touch with you faster

Privacy statement: Your privacy is very important to Us. Our company promises not to disclose your personal information to any external company with out your explicit permission.

Send