Privacy statement: Your privacy is very important to Us. Our company promises not to disclose your personal information to any external company with out your explicit permission.
Product Categories
Polyurethane Paving Materials
(Total 12 Products for Permeable Cement Stone Construction Plan)
Water permeable adhesive stone Courts Sports Surface Flooring Athletic Running Track
Water permeable adhesive stone Operating process First, the ratio A: B = 1:1 Colored stones: Adhesive = 40:1 Second, the process The first step: the selection of adhesive stone 1, polished through the screening of various colors of washed stone particle size 3-5 mm best 2, the color should try to avoid the choice of...
Asphal Cement Courts Sports Surface Flooring Athletic Running Track
Composite EPDM course First, the ratio The bottom layer is mainly composed of QD-02 or QD-A: QD-B=4:1 Middle layer: Glue and black granule mixture (1:8) CD glue dosage 0.11 kg/m2, particle dosage 0.9kg/m2 Second, the process 1. Basic ground treatment, including removal of debris, ground grinding, treatment of...
Asphal Cement PU Glue Binder Adhesive Courts Sports Surface Flooring Athletic Running Track
Hybrid plastic track The bottom layer of the runway is uniformly mixed by the three components of 3071A, 3071B and catalyst in a certain proportion and then spread to the site. The surface layer must be fully cured under the condition that the bottom layer is completely cured. The synthetic surface layer has high...
The non-slip pavement is a special polymer adhesive applied to the road surface and sprinkled with colored wear-resistant aggregates of different colors. The color non-slip road surface is a brand-new road surface beautification technology with advanced construction technology. Compared with traditional black asphalt...
Solvent-free polyurea floor construction process 1. Grassroots requirements (1) The strength grade of the base concrete structure cannot be lower than C25. (2) The base layer should be surfaced with pure pulp and the machine should be lighted to achieve leveling. (3) The treatment of the concrete ground base layer...
Yellowing Resistance Binder HCM(S) Polyurethane adhesive is a single component of wet curing material, with low VOC content, no environmental pollution, adjustable toughness, simple bonding process, and good bonding adaptability with a variety of base materials. 1. Technical indicators Colorless or light yellow...
Silicon PU Underlying Layer One-Component Sealant Code: QD-02 Construction technology: 1. The surface treatment of the substrate shall be clean, free from dust and oil stains, etc., and the construction shall be carried out in the dry state of the foundation 2. The product can be rolled or sprayed.
Wearable Polyurethane Glue Binder Adhesive Courts Sports Surface Flooring Athletic Running Track
Mixed runway construction plan First, the ratio The bottom layer is mainly composed of QD-02 or QD-A: QD-B=4:1 Middle layer: 3071A/3071B black particles Finish: Two-component topsheet 303A/3031B Second, the process 1. Basic ground treatment, including removal of debris, ground grinding, treatment of expansion joints,...
Anti-yellowing PU Courts Sports Surface Flooring Athletic Running Track
Compound runway First, the ratio The bottom layer is mainly composed of QD-02 or QD-A: QD-B=4:1 Middle layer: black particles, CD glue /3071ZA/3071B Finish: Two-component facing material 3041A/3041B Second, the process 1. Basic ground treatment, including removal of debris, ground grinding, treatment of expansion...
High Elasticity 5:1 Pavement Materials Courts Sports Surface Flooring Athletic Running Track
The permeable pavement is a way to allow rainwater to penetrate quickly into the ground, so that the groundwater is replenished and the ecology is protected. It is developed by Europe, America, Japan and other countries for the road defects of urban roads. It develops and uses some urban environmental problems that...
Colourful Water-based runway top coat Courts Sports Surface Flooring Athletic Running Track
Waterborne polyurethane topcoat Instructions for use and precautions Key points: Properly mix and evenly spread thin coating construction. The surface of the base layer should be kept clean before construction, and no pollutants are allowed. All contaminants such as fats, greases, paint residues, chemicals and...
Anti UV Polyurethane Glue Binder Adhesive Courts Sports Surface Flooring Athletic Running Track
Mixed court First, the ratio The bottom layer is mainly composed of QD-02 or QD-A: QD-B=4:1 Middle layer: Two-component course paving material 3051A/B (5:1), 3071A/B (7:1) plus a certain proportion of black particles. Usage: 1.3 kg/m2 Upper layer: surface layer Q3041A/B (4:1) Second, the process 1. Basic ground...
Categories
High Quality Products
Send Us a Message
We didn't put all products on website. If you can't find the product you're looking for, please contact us for more information.
Privacy statement: Your privacy is very important to Us. Our company promises not to disclose your personal information to any external company with out your explicit permission.
Fill in more information so that we can get in touch with you faster
Privacy statement: Your privacy is very important to Us. Our company promises not to disclose your personal information to any external company with out your explicit permission.