Communicate with Supplier? Supplier
Jiguang Chen Mr. Jiguang Chen
What can I do for you?
Chat Now Contact Supplier
 Tel:+86-533-3781329 Email:centuryunion@vip.163.com
Home > Products > Polyurethane Paving Materials > GB 7:1 Two-Component Binder-Red > Long Life 7:1 Pavement Materials Courts Sports Surface Flooring Athletic Running Track
Long Life 7:1 Pavement Materials  Courts Sports Surface Flooring Athletic Running Track
Long Life 7:1 Pavement Materials  Courts Sports Surface Flooring Athletic Running Track
Long Life 7:1 Pavement Materials  Courts Sports Surface Flooring Athletic Running Track
  • Long Life 7:1 Pavement Materials  Courts Sports Surface Flooring Athletic Running Track
  • Long Life 7:1 Pavement Materials  Courts Sports Surface Flooring Athletic Running Track
  • Long Life 7:1 Pavement Materials  Courts Sports Surface Flooring Athletic Running Track

Long Life 7:1 Pavement Materials Courts Sports Surface Flooring Athletic Running Track

    Payment Type: L/C,T/T,D/P
    Incoterm: FOB,CFR,CIF
    Min. Order: 2 Ton
    Delivery Time: 20 Days

Basic Info

Model No.: 3071A/B(GB) 250kg/barrel

Additional Info

Packaging: barrel,pallet

Productivity: MT/year

Brand: ON THE WAY

Transportation: Ocean,Land,Air

Place of Origin: China

Certificate: ISO9001,ISO14001,OHSAS18001

Port: Qingdao

Product Description

Main ingredients: 3071A, 3071B

Specification: A component: 250 kg/drum, B component: 200 kg/drum

Use ratio: weight ratio: 3071A: 3071B=7:1

Example: 3071A 21kg, 3071B 3kg, catalyst 0.24kg (1-1.2% of the total AB, specifically adjusted according to local air temperature and humidity).

Usage: according to the ratio of 3071B -- 3071A -- catalyst, fully stir and evenly spread the construction.

The construction technology

1. Pu-pu course: mix AB materials and catalyst evenly in proportion on the treated cement or asphalt foundation and then spread the construction.

2. Mixing course and track: mix AB materials, black particles and catalyst evenly in proportion on the treated cement or asphalt foundation and then spread the construction.

3. The theoretical dosage of this product is 1.3kg//mm (the dosage varies according to the basic material), and the construction is carried out uniformly and without omission.

4, after the table can be dry (24 hours or so surface non-stick hands, depending on the temperature, humidity and different), and then the next construction.

Notes:

1. Construction should be avoided in rainy or wet weather, so as not to affect the adhesion between layers.

2. The materials should be used as soon as possible after they are prepared. The leftovers should not be returned to the original packaging.

3. After the completion of construction, all appliances shall be cleaned with matching diluents and dried for later use.

Safety tips:

The product should be stored, transported and constructed in accordance with the regulations. Put an end to fire and stay away from heat source.Well-ventilated, cool and dry, strengthen labor protection.

7:1Two-Component Bind-Red national standand


Looking for ideal Red Polyurethane Binder Manufacturer & supplier ? We have a wide selection at great prices to help you get creative. All the Two-Component Binder For Runway are quality guaranteed. We are China Origin Factory of 7:1 Two-Component Binder Part A. If you have any question, please feel free to contact us.

Product Categories : Polyurethane Paving Materials > GB 7:1 Two-Component Binder-Red

Email to this supplier
  • Mr. Jiguang Chen
  • Your message must be between 20-8000 characters

Hot Products

Related Products List

Home

Phone

Skype

Inquiry