Home > Products > Sports court Silicon PU > Silicon PU Surface Layer Two-Component Coating > Eco-Friendly Silicon PU Surafces Layer Coating Water-based Courts Sports Surface Flooring Athletic Running Track

Eco-Friendly Silicon PU Surafces Layer Coating Water-based Courts Sports Surface Flooring Athletic Running Track

Payment Type:
L/C,T/T,D/P
Incoterm:
FOB,CFR,CIF
Min. Order:
2 Ton
Transportation:
Ocean,Land,Air
Port:
Qingdao
Share:
  • Product Description
Overview
Product Attributes

Model No.SQM-A/B-red 20kg/group

BrandON THE WAY

Supply Ability & Additional Information

Packagingbarrel,pallet

ProductivityMT/year

TransportationOcean,Land,Air

Place of OriginChina

CertificateISO9001,ISO14001,OHSAS18001

PortQingdao

Payment TypeL/C,T/T,D/P

IncotermFOB,CFR,CIF

Packaging & Delivery
Selling Units:
Ton
Package Type:
barrel,pallet

Main ingredients:

Main paint, curing agent ( red)

Specifications:

20kg/ group (sqm-a :18.75kg, sqm-b :1.25kg)

Service temperature:

5 ℃ to 35 ℃

Ratio used:

Weight ratio sqm-a: sqm-b = 15:1

Example: sqm-a: 18.75kg, sqm-b: 1.25kg, 0.3kg quartz sand, and about 3kg pure water (the total amount of AB is about 15% and appropriate amount is added according to local actual situation. In order to avoid color difference, the percentage of pure water added in the same site should be the same.)

Usage:

1. (proportioning sequence) sqm-b -- sqm-a -- quartz sand -- pure water, fully stirred and evenly sprayed or rolled.(first stir sqm-a thoroughly before adding sqm-b)

2. Water-based topcoat can be sprayed or rolled, with theoretical dosage of 0.2kg/㎡, mixed evenly and directly sprayed or rolled, and the last one does not add quartz sand.

Notes:

1. Construction should be avoided in rainy, humid and high temperature periods, so as to avoid the occurrence of blow-up, delamination and other phenomena affecting product quality.

2. After opening, it should be used in one time as soon as possible.

3. Before painting, the surface layer must be treated with wool, cleaned and free of dirt, grease, etc. After construction, the surface layer shall be soaked without water for 10 hours.

4. After the completion of construction, all appliances shall be cleaned and dried with matching diluents.

5. The product shall be stored, transported and constructed in accordance with the provisions, and the ignition shall be eliminated and kept away from heat sources.Well-ventilated, cool and dry, strengthen labor protection.

Silicon PU Surface Layer Two-Component Coating


Product Categories : Sports court Silicon PU > Silicon PU Surface Layer Two-Component Coating

Home > Products > Sports court Silicon PU > Silicon PU Surface Layer Two-Component Coating > Eco-Friendly Silicon PU Surafces Layer Coating Water-based Courts Sports Surface Flooring Athletic Running Track
Email to this supplier
  • *Subject:
  • *To:
    Mr. Jiguang Chen
  • *Email:
  • *Message:
    Your message must be between 20-8000 characters
Send Inquiry
*
*

Related Products List

Home

Product

Whatsapp

About Us

Inquiry

We will contact you immediately

Fill in more information so that we can get in touch with you faster

Privacy statement: Your privacy is very important to Us. Our company promises not to disclose your personal information to any external company with out your explicit permission.

Send