Communicate with Supplier? Supplier
Jiguang Chen Mr. Jiguang Chen
What can I do for you?
Chat Now Contact Supplier
 Tel:+86-533-3781329 Email:centuryunion@vip.163.com
Home > Products > Other Plastic Track Series > SGS IAAF Certificated Courts Sports Surface Flooring Athletic Running Track
SGS IAAF Certificated Courts Sports Surface Flooring Athletic Running Track
SGS IAAF Certificated Courts Sports Surface Flooring Athletic Running Track
SGS IAAF Certificated Courts Sports Surface Flooring Athletic Running Track
  • SGS IAAF Certificated Courts Sports Surface Flooring Athletic Running Track
  • SGS IAAF Certificated Courts Sports Surface Flooring Athletic Running Track
  • SGS IAAF Certificated Courts Sports Surface Flooring Athletic Running Track

SGS IAAF Certificated Courts Sports Surface Flooring Athletic Running Track

Product Description

The 13mm ventilated plastic runway construction process is a two-step construction method.
The bottom layer of the granules was laid to a thickness of 10-11 mm. After curing, a PU adhesive layer of EPDM particles having a thickness of 2-3 mm was sprayed thereon. (Note: If the height of the site is not uniform, the thickness of the paving should be determined according to the site conditions to ensure the flatness after the paving is completed).
Process sketch: cleaning the site → particle bottom machinery (manual) paving → runway topcoat spraying → measuring line → completion.
Construction plan description
Preparation before Plastic Track Construction
After the Plastic Track construction team enters the market, first check the type and quantity of all materials, list them, and submit them to the supervisor for signature.
Check if the mechanical equipment such as the mixer and the push rod are working properly, find the problem and repair it in time. Prepare the construction tool and adjust the thickness and thickness of the machine according to the thickness required by the construction drawings. Conduct spot checks on the materials on site and prepare a test piece for each lot number. The material was found to have deteriorated and the color change should be stopped. If there is sediment, make it even.
According to the actual situation of the plastic runway project, the construction section is appropriately divided, and the construction line position and construction line are measured.

Plastic track compounding personnel should carefully check the type and type of raw materials, confirm that they are the same materials as the construction site, so that the materials are stacked on the shelves, neatly arranged, and the barrels can be reserved.

Breathable plastic track construction

Looking for ideal Breathable Plastic Track Material Manufacturer & supplier ? We have a wide selection at great prices to help you get creative. All the School Breathable Plastic Track Material are quality guaranteed. We are China Origin Factory of Stadium Breathable Plastic Track Material. If you have any question, please feel free to contact us.

Product Categories : Other Plastic Track Series

Email to this supplier
  • Mr. Jiguang Chen
  • Your message must be between 20-8000 characters

Hot Products

Related Products List

Home

Phone

Skype

Inquiry